Search
824 results for 2021:
-
PUBSSMin20240724-1.pdf
AMI mass deployment commenced in 2021 and the risk of old and potentially degraded service lines breaking due to the disruption caused by the meter replacement was the basis.View More -
SD8-Telecom-Final-3-13-20.pdf
The milestones for this measurement are to complete the engineering and design by March 31, 2 2021, and have Gigabit internet service available to 40% of properties by March 31, 2022. 4.View More -
PUBSSMin20220810.pdf
In 2024, monthly drinking water bills will look similar to 2021. Ms. Collins concluded by reviewing the next steps in this process.View More -
NonInterimRegulations.pdf
Tideflats Non-Interim Regulation Draft Letter June 9, 2021 LaTasha Wortham, Regional Relations Manager Overview • Background • Overview of Proposed Letter • Feedback/Questions Background • Timeline • ProposedView More -
5026_TPU_Winter_U_Newletter_1121_Web.pdf
Our employees have a long-standing tradition of giving back to the community, but 2021 raised the bar on achievement.View More -
4-02-24-Final-FTC-Meeting-Summary.pdf
In 2021 a letter was sent to FERC by Jamie Hererra Butler complaining about the decline of the fishery.View More -
U-11450.pdf
ISSUE: The WSDOH issued a consent decree in 2021 giving Tacoma Water 30 years for P1 to meet the WAC 246-290-230 pressurization requirements.View More -
SurplusRealProperty.pdf
Reports of the Director Surplus Properties Real Property Services Public Utility Board – January 13, 2021 1 1 TPU Surplus Real Property Policy Recap • Adopted on 3/15/2020 with following considerationsView More -
PUBMin20220928.pdf
Through an administrative oversight, the extension of the 2006 amended agreement was not completed by August 1, 2021, and therefore, the proposed new Water Supply Agreement will confirm and reestablishView More -
Agenda-10-9-19.pdf
D-5 Resolution U-11107 – Adopt Tacoma Power’s ten-year, 2020/2029 achievable economic conservation potential of 233,660 MWh and a two-year 2020/2021 conservation target of 46,732 MWh.View More