Cowlitz Fisheries Technical Committee
The Fisheries Technical Committee (FTC) was created by the settlement agreement for the Cowlitz River Hydroelectric Project and is part of the project’s Federal Energy Regulatory Commission license.
The committee is responsible for making recommendations on actions to maximize the effectiveness of fisheries mitigation, protection and enhancement measures in the Cowlitz River Project area.
These recommendations include developing study protocols and plans for hatchery remodeling, fish management, fisheries disease management and fish passage. The FTC also makes adaptive management recommendations as indicated by monitoring and evaluation.
The FTC includes one representative each from Tacoma Power, the National Marine Fisheries Service, the U.S. Fish and Wildlife Service, the Washington Department of Fish and Wildlife, the Washington Department of Ecology, and the Yakama Nation; and one individual representing Trout Unlimited and American Rivers.
This committee first met in November 2000 to begin implementing some of the measures identified in the Settlement Agreement.
If you have questions or comments regarding the FTC or processes related to this committee, please contact Melora Shelton at 253-888-5425 or mshelton@cityoftacoma.org.
The FTC meets on the first Tuesday (930am-3pm) of every month with the exception of July and the meetings are open to the public. Meetings are conducted on the Microsoft Teams virtual platform with in person meetings on a quarterly basis when possible.
Sign up for the Cowlitz eNewsletter: CLICK HERE!
Click here to join the meeting!
FISHERIES AND HATCHERIES MANAGEMENT PLAN – 2020
FHMP TRANSITION PLANS – 2022
FHMP 2019 DRAFT APPENDICES
- Appendix – FHMP Draft Final Example Big Table – (Posted 10/17/19)
- Big Table for Spring Chinook Salmon – (posted 1/16/2020)
- Big Table for Fall Chinook Salmon – (posted 1/16/2020)
- Big Table for Coho Salmon – (posted 1/16/2020)
- Big Table for Winter Steelhead – (posted 1/16/2020)
ANNUAL PROGRAM REVIEW
COWLITZ RESTORATION AND RECOVERY PROGRAM
FTC Final Meeting Summaries
2024 Meeting Summaries
- 1-10-24 Meeting Summary
- 2-06-24 Meeting Summary
- 3-05-24 Meeting Summary
- 4-02-24 Meeting Summary
- 5-07-24 Meeting Summary
- 6-04-24 Meeting Summary
- 8-06-24 Meeting Summary
- 9-03-24 Meeting Summary
- 10-01-24 Meeting Summary
PAST YEARS MEETING SUMMARIES
- 2023 meetings summaries
- 2022 meeting summaries
- 2021 meeting summaries
- 2020 meeting summaries
- 2019 meeting summaries
- 2018 meeting summaries
- 2017 meeting summaries
- 2016 meeting summaries
- 2015 meeting summaries
- 2014 meeting summaries
- 2013 meeting summaries
- 2012 meeting summaries
- 2011 meeting summaries
- 2010 meeting summaries
- 2009 meeting summaries
- 2008 meeting summaries
FTC Final Decision Documents
- 2022
-
- 2022 01 CFNSC Study Plans
- 2022 02 FHMP Transition Plans
- 2022 03 CRR HAP Subgroup charter
- 2022-04 Annual Project Review – Hatchery Production
- 2022 05 CRR HAP 2023 Round
- 2022-06 CRR Final Ranked List
- 2022-07 Satellite Rearing
- 2022-07a Satellite Rearing Revision
- 2022 08 Public FTC Meetings
- 2022 09 CRR Strategy Update
- 2021
- 2020
- 2019
- 2018
- 2017
-
- 2017-01 Cowlitz Falls Dam 2016 Evaluations
- 2017-02 LCFRB on SRFB proposal for Upper Cowlitz-Cispus
- 2017-03
- 2017-04
- 2017-05
- 2017-06 Cowlitz Restoration and Recovery Strategy
- 2017-07
- 2017-08 CRR subcommittee charter
- 2017-09 CRR Habitat Assessment Scope of Work
- 2017-10 Suspension of annual gravel augmentation for 2017
- 2016
- 2015
-
- CRR Plan Implementation-habitat assessment – attachment
- CRR Plan Priorities – attachment
- CRR Plan Introduction – attachment
- 2015 Cowlitz Complex hatchery production
- Summer steelhead recycling
- Mayfield Dam downstream migrant studies
- 2015 Cowlitz Falls Dam smolt tagging methodology
- 2015 Cowlitz Falls Dam smolt study methodology
- 2015 FTC membership status quo
- 2015 Cowlitz Restoration & Recovery Process
- 2014
-
- 2014 CFNSC 100% design approval
- 2014 Annual Project Review Process
- 2014 Upper Riffe Lake collector
- 2014 CF Dam weir box, 2015-17
- 2014 CFNSC 90% design approval
- 2014 HOR steelhead upper basin
- 2014 Cowlitz Falls Dam smolt tagging methodology
- 2014 Mayfield survival study scope of work
- 2014 CFNSC 60% design approval
- 2014 CF Dam weir box, 2014